Dredging
[/et_pb_text][et_pb_text _builder_version=”3.0.106″ background_layout=”light”]
2.5 Excavation/Dredging
All dredging, filling, and excavation activities within the leased or
permitted premises must comply with all applicable local, state, and federal requirements, and must be completed in accordance with any required permit from U.S. Army Corps of Engineers (USACE). In addition, the following conditions and restrictions apply to any excavation, dredging, and filling activities within the FERC Project Boundary and subject to a PLUP issued by SRA-LA:
- Some proposed dredging, filling, or excavation activities may be eligible
for approval under a Programmatic General Permit between SRA-LA and USACE. - SRA-LA reserves the right at its sole discretion to modify, limit, or deny
any proposed dredging, filling, or excavation activities within the FERC Project Boundary for the Toledo Bend Project, as necessary to protect the interest of the public and/or the electric generating, water supply, recreational, historical, and environmental values at the Toledo Bend Project.
Copies of dredging requirements can be obtained at the SRA-LA office.